Spatial Adequacy Assessment Summary
The following table compares the existing capacity of the school facility (on the left) with the future capacity provided by the Master Plan (on the right).
Existing Capacity | Master Plan Capacity | |||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Grades | Grades 10,11,12,Other | Grades 10,11,12,Other | ||||||||||||||||||||||||||||||||||||||||||||
Enrollment | Current (2016–2017) | 69 | Projected | 69 | ||||||||||||||||||||||||||||||||||||||||||
Classrooms | Permanent | (loaded) | 5 | Permanent | (loaded) | 5 | ||||||||||||||||||||||||||||||||||||||||
(non-loaded) | 0 | (non-loaded) | 0 | |||||||||||||||||||||||||||||||||||||||||||
Portable | (loaded) | 0 | Portable | (loaded) | 0 | |||||||||||||||||||||||||||||||||||||||||
(non-loaded) | 0 | (non-loaded) | 0 | |||||||||||||||||||||||||||||||||||||||||||
Teaching Stations | ||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||
Non Teaching Stations | ||||||||||||||||||||||||||||||||||||||||||||||
|
|