Facility Conditions Assessment Summary
Generally, the property appears to have been constructed within industry standards in force at the time of construction. The property appears to have been well maintained in recent years and is in fair overall condition. According to property management personnel, the property has had a limited capital improvement expenditure program over the past three years, primarily consisting of some new roofs at classroom buildings, minimum routine maintenance and equipment replacement on an as needed basis. Supporting documentation was not provided in support of these claims but some of the work is evident.
Facility Maintenance and Repair Costs
Maintenance/Repair Cost Category | Year(s) | Estimated Cost |
---|---|---|
Seismic Repairs ( view the evaluation report – large file, see note* ) | (AB300) | |
Immediate Repairs | 0 | |
Repairs Total (Seismic+Immediate) |
0 + AB300 |
|
Replacement Reserves | 1–10 | |
Capital Needs Total (Short-Term Costs) |
0–10 + AB300 |
|
Long-Term Items | 11–19 | |
Deficiency Repair Total (Long-Term Costs) |
0–19 + AB300 |
|
*Note: An additional five percent [5%] escalation has been added to the Seismic Repairs costs described in the evaluation report to carry the values from 2016 dollars to 2017 dollars. |